Past Projects

Fort Monroe Community Center

Project Details:  Installed new engineered siphonic drainage system. Installed new conventional overflow drains with piping and replaced existing primary drains.

Burton Center

Project Details: Installed new cast iron overflow roof drains with new cast iron piping, routed to exterior wall, discharged into…

Costco Bathroom Remodel

Project Details: Removed and replaced water closets and carriers. Adjusted carrier to conform to ADA water closet height codes. Installed…

Dan Allen Parking Deck

Project Details: Installed parking deck drains, cast iron piping, and connected to the existing storm lines.

NTPU Naval Base

Project Details: Installed galvanized steel piping for new downspouts.

South Johnston High School

Project Details: Installed underground storm drainage lines to existing catch basins. Installed new catch basins for subgrade drain lines. Graded…

Duke Energy, Garner

Project Details: Installed new PVC piping for new overflow drain lines. Installed downspout nozzles for discharge. Insulate all new piping.

DPS Staff Building

Project Details: Installed new gas piping, fittings, gas cocks, and more.
Menu